News Logo
Global Unrestricted
Agras T50 Agriculture Surveying

T50 Surveying Tips for Solar Farms in Low Light

January 29, 2026
8 min read
T50 Surveying Tips for Solar Farms in Low Light

T50 Surveying Tips for Solar Farms in Low Light

META: Master low-light solar farm surveying with the Agras T50. Expert tips on antenna positioning, RTK setup, and multispectral imaging for centimeter precision results.

TL;DR

  • Antenna positioning at 45-degree elevation angles maximizes RTK fix rates above 95% during dawn and dusk surveys
  • The T50's IPX6K rating enables reliable operation in morning dew and light precipitation conditions
  • Multispectral imaging combined with thermal sensors reveals panel defects invisible in standard daylight inspections
  • Proper swath width calibration reduces flight time by 30% while maintaining centimeter precision

Low-light conditions present unique challenges for solar farm surveying—but they also reveal critical panel defects that midday inspections miss entirely. The DJI Agras T50, while primarily designed for agricultural applications, has emerged as a surprisingly capable platform for photovoltaic infrastructure assessment. This guide delivers field-tested antenna positioning strategies and operational protocols that maximize your survey accuracy when ambient light drops below 500 lux.

Why Low-Light Surveying Matters for Solar Installations

Solar panels experience thermal cycling that creates micro-fractures and hotspots. These defects become most visible during temperature transition periods—specifically the 30-45 minutes after sunrise and before sunset.

During these windows, differential cooling rates across damaged cells create thermal signatures that standard midday thermography cannot detect. The T50's payload capacity supports dual-sensor configurations that capture both multispectral and thermal data simultaneously.

The Physics Behind Dawn and Dusk Advantage

Panel surface temperatures during low-light periods typically range from 15-25°C cooler than peak afternoon readings. This temperature differential amplifies the contrast between healthy cells and compromised areas.

Defective cells retain heat differently, creating 2-4°C variations that thermal sensors detect with high reliability. Midday surveys often show temperature variations below 1°C—well within normal operational variance and easily missed.

Expert Insight: Schedule your primary survey passes for 20-35 minutes after sunrise when panel temperatures are rising but ambient light remains below 1,200 lux. This window provides optimal thermal contrast while maintaining sufficient visibility for visual correlation.

Antenna Positioning for Maximum RTK Performance

The T50's dual-antenna GNSS system requires careful positioning consideration during low-light operations. Satellite geometry changes significantly during dawn and dusk periods, affecting your RTK fix rate and overall positioning accuracy.

Optimal Base Station Placement

Position your RTK base station on the eastern perimeter for morning surveys and western perimeter for evening operations. This placement ensures the drone maintains clear line-of-sight to the base antenna throughout the survey pattern.

Key positioning factors include:

  • Elevation clearance: Minimum 15 degrees above horizon obstructions
  • Multipath reduction: Distance of at least 3 meters from reflective surfaces including panel arrays
  • Ground plane stability: Tripod mounting on concrete or compacted surfaces
  • Cable management: RTK antenna cables routed away from power inverters and transformers

Drone Antenna Considerations

The T50's onboard antennas perform optimally when the aircraft maintains consistent heading orientation relative to satellite constellation geometry. During low-light periods, satellite availability in certain sky sectors decreases.

Program your flight paths to approach survey lines from directions that keep the primary GNSS antenna oriented toward the highest satellite density quadrant. For most Northern Hemisphere locations, this means favoring south-facing approaches during morning operations.

Pro Tip: Monitor your RTK fix rate during the first survey line. If it drops below 92%, pause operations and adjust your base station position 0.5 meters higher. Atmospheric conditions during temperature transitions can create unexpected signal interference layers near ground level.

Flight Planning for Centimeter Precision

Achieving centimeter precision over large solar installations requires meticulous flight planning that accounts for low-light sensor limitations and atmospheric conditions unique to transition periods.

Swath Width Optimization

The T50's survey payload supports adjustable swath configurations. For low-light solar farm work, reduce your standard swath width by 15-20% compared to midday operations.

This reduction compensates for:

  • Decreased sensor signal-to-noise ratios
  • Potential motion blur from longer exposure requirements
  • Atmospheric haze accumulation near ground level during temperature inversions
Parameter Midday Setting Low-Light Setting Adjustment Rationale
Swath Width 12 meters 9.5 meters Improved overlap compensation
Flight Speed 8 m/s 6 m/s Reduced motion blur
Altitude AGL 35 meters 30 meters Enhanced ground sampling distance
Front Overlap 75% 80% Better feature matching in shadows
Side Overlap 65% 70% Consistent coverage at panel edges
RTK Fix Rate Target 90% 95% Tighter accuracy requirements

Dealing with Temperature Inversions

Morning surveys frequently encounter temperature inversion layers that affect both flight performance and data quality. These inversions create density variations that can introduce 3-5 centimeter vertical positioning errors if not properly managed.

Monitor your barometric altitude readings against GNSS altitude throughout the survey. Discrepancies exceeding 2 meters indicate significant inversion effects requiring flight plan adjustment.

Multispectral Configuration for Panel Assessment

While the T50's agricultural heritage centers on crop analysis, its multispectral capabilities translate effectively to photovoltaic inspection when properly configured.

Band Selection Strategy

Solar panel defect detection benefits most from:

  • Near-infrared (NIR): Reveals subsurface cell damage and delamination
  • Red edge: Highlights coating degradation and surface contamination
  • Thermal infrared: Identifies electrical hotspots and connection failures

Configure your sensor to capture 12-bit depth minimum during low-light operations. The additional dynamic range preserves detail in shadow areas that 8-bit capture loses entirely.

Calibration Requirements

Nozzle calibration protocols from agricultural applications have direct parallels in sensor calibration for survey work. Just as spray drift affects chemical distribution accuracy, sensor drift affects radiometric consistency across your survey area.

Perform reflectance panel calibration immediately before launch and again within 10 minutes of landing. Low-light conditions change rapidly, and calibration drift exceeding 5% compromises your ability to compare data across multiple survey dates.

Common Mistakes to Avoid

Ignoring Dew Point Conditions

Morning surveys often coincide with dew formation on panel surfaces. While the T50's IPX6K rating protects the aircraft from moisture exposure, dew on panels creates specular reflections that corrupt multispectral readings.

Check surface conditions before launch. If visible moisture exists, delay operations by 15-20 minutes or until panel temperatures rise 3°C above dew point.

Overlooking Battery Performance Degradation

Lithium batteries deliver reduced capacity in cool morning conditions. Expect 10-15% shorter flight times compared to afternoon operations at the same location.

Plan conservative mission durations and maintain battery temperatures above 20°C using insulated storage between flights.

Rushing the RTK Initialization

Cold-start RTK convergence takes longer during periods of reduced satellite visibility. Allow full 3-minute initialization before beginning survey lines, even if the system reports fix status earlier.

Premature survey initiation frequently results in 5-10 centimeter positioning jumps mid-flight that require complete resurvey of affected areas.

Neglecting Shadow Mapping

Panel rows create predictable shadow patterns during low-light periods. These shadows move measurably during extended survey operations.

For installations exceeding 50 hectares, divide your survey into time-blocked segments and process each segment independently. Attempting to mosaic data captured across 45+ minute windows introduces shadow-edge artifacts that complicate defect identification.

Frequently Asked Questions

What RTK fix rate should I maintain for reliable centimeter precision?

Target a minimum 95% RTK fix rate throughout your survey operation. Rates between 90-95% remain acceptable for general mapping but may introduce 3-5 centimeter horizontal uncertainty in specific areas. Below 90%, consider repositioning your base station or rescheduling the survey for improved satellite geometry.

How does the T50 handle sudden lighting changes during sunrise surveys?

The T50's sensor systems include automatic exposure compensation, but rapid light transitions can overwhelm these adjustments. Configure your camera settings for manual exposure with auto-ISO to maintain consistent shutter speeds while allowing sensitivity adjustments. This approach prevents motion blur while accommodating brightness changes of up to 2 stops per minute during rapid sunrise conditions.

Can I survey during light rain if the T50 has IPX6K protection?

The IPX6K rating protects against high-pressure water jets, making light rain operationally safe for the aircraft. However, water droplets on sensor optics severely degrade data quality. Postpone multispectral surveys if precipitation probability exceeds 20% or if visible moisture accumulates on lens surfaces during pre-flight inspection.


Low-light solar farm surveying with the Agras T50 demands attention to environmental factors that midday operations can safely ignore. The protocols outlined here represent accumulated field experience across 200+ survey missions at installations ranging from 5 to 500 hectares.

Mastering antenna positioning, understanding atmospheric effects, and respecting the platform's agricultural design heritage while adapting it for infrastructure inspection—these skills separate adequate surveys from genuinely actionable inspection data.

Ready for your own Agras T50? Contact our team for expert consultation.

Back to News
Share this article: